Contents Wiring diagrams Section: DOHC Petrol Engine All sections

Torque Guide Values Opel Meriva A

Nm
Axle shaft in wheel hubTighten to 150 Nm, slacken by 45°, then tighten to 250 Nm
Starter to cylinder block25
Exhaust manifold to cylinder head8
Turbocharger intake pipe to turbocharger8
Battery support to body15
Torsional vibration damper to crankshaft95 + 30° + 15° 1)
Throttle body to intake manifold8
Intake pipe pressure sensor to intake manifold8
Dynamic oil level control to oil pan10
Intake manifold to cylinder head20
Accelerator pedal to bulkhead12
Alternator on pump module and cylinder block35
Transmission to cylinder block (M 10)40
Transmission to cylinder block (M 12)60
Left engine damping block support to transmission35
Right engine damping block support to cylinder block60 + 45° + 15° 1)
Rear engine damping block bracket to transmission80
Engine damping block bracket to engine damping block support (left)55
Engine damping block bracket to engine damping block support (right)55
Engine control unit bracket to intake manifold8
Tank vent valve bracket to intake manifold8
Heat shield to exhaust manifold8
Crankshaft pulse pick-up to cylinder block8
Crankshaft pulse pick-up disk to crankshaft15
Bulkhead closure panel insulation to body9
Refrigerant line to compressor20
Refrigerant line to receiver-dryer20
Refrigerant line to refrigerant line20
Ribbed V-belt tensioner to cylinder block50
Knock sensor to cylinder head20
Fuel rail to intake manifold flange8
Coolant flange on cylinder head8
Coolant pump on pump module8
Coolant pipe to cylinder block, coolant pump and coolant flange8
Coolant feed pipe to turbocharger (banjo bolt)35
Crankshaft bearing cap to cylinder block50 + 45° + 15° 1)
Intercooler to radiator8
Mixture control oxygen sensor to exhaust manifold40
Catalytic converter control oxygen sensor on exhaust front end40
Air cleaner housing to body
Fan housing to radiator5
Rear engine damping block to bracket55
Rear engine damping block to front axle body55
Left engine damping block to body (side member)20
Right engine damping block to body (side member)35
Front engine damping block to transmission60
Front engine damping block to front axle body55
Engine transport shackle to cylinder head25
Camshaft bearing caps to cylinder head8
Camshaft sprocket to camshaft50 + 60° + 15° 1)
Camshaft sensor to cylinder head6
Oil drain bolt to oil pan14
Oil pressure switch to cylinder block20
Oil pressure switch to cylinder head20
Oil filter housing to cylinder block25
Oil pump cover on pump module8
Oil intake pipe to oil pan10
Oil baffle plate on oil pan10
Oil pan to transmission housing
Turbocharger oil feed line to turbocharger (banjo bolt)30
Oil pan on cylinder head and pump module10 2)
Con-rod bearing cap on con-rod25 + 30° + 15° 1)
Pump module on cylinder block20
Wheel to wheel hub110
Pulley to crankshaft95 + 30° + 15°
Coolant pump strap disc on coolant pump20
Crankcase vent pipe to intake manifold8
Swing arm to spring strut55
Catalytic converter clamp to turbocharger7
Hose clamps for air intake hose3.5
Flywheel to crankshaft
Exhaust manifold support to exhaust manifold
Exhaust manifold support to cylinder block
Thermostat housing on coolant flange8
Lower radiator bracket to front axle body15
Climate control system compressor on pump module and cylinder block
Condenser to radiator5
Closure bolt, oil pressure regulating valve to pump module21
Front axle body to body (all bolts)90 + 45° + 15° 1)
Front exhaust pipe to exhaust manifold
Rear toothed belt cover on cylinder head6
Toothed belt cover upper section to rear toothed belt cover4
Lower part of toothed belt cover to pump module6
Toothed belt tensioner on cylinder head20
Toothed belt deflection pulley on cylinder head25
Spark plugs to cylinder head25
Ignition module to cylinder head8
Intermediate spindle to steering intermediate spindle24 3)
Cylinder head to cylinder block25 + 90° + 90° + 90° + 45° 1)
Cylinder head cover to cylinder head8

1

) Use new bolts

2

) Recut threads before re-use and insert bolts with screw locking compound. The installation time including torque checking is max. 10 min.

3

) Insert new bolts with screw locking compound.