Objective:
Operational check.
Measurement:
Plot of voltage at the signal output of the air mass meter.
Preparation:
Switch off the engine and ignition.
Connections:
| INPUT A | COM/TRIGGER | INPUT B |
|---|---|---|
| Connect red measurement lead to pin 2 of the plug connector on the air mass meter. Connect the black ground lead to ground. |
Procedure Tech 31:
- 1. Download Reference curve.
- 2. Start engine and allow it to idle.
- 3. Press the accelerator pedal once quickly down to the limit stop and immediately release it again. The measurement should not take longer than one second.
Reference Curve:
If the measured signal plot does not approximately correspond with the reference curve after repeated testing, check the air mass meter system as described in the checking procedure.