Installation is performed in the reverse order. Note the following
Note. Bolts -1- and -2- are dowel bolts.
- Tighten bolts in sequence -1...5- initially only finger-tight.
- Then tighten bolts in sequence -1...5- to specified torque.
- Tighten bolt (arrow) at bracket for After-run coolant pump -V51-.
- Drive back respective bushings for securing bolts slightly to facilitate installation of Generator, power steering pump and air conditioning compressor.
- Install Generator.
Refer to 27 BATTERY, STARTER, GENERATOR, CRUISE CONTROL
- Install air conditioning compressor.
Refer to 87 AIR CONDITIONING
- Install power steering pump.
- Install cross piece.
Refer to 40 FRONT SUSPENSION
- Install poly V-belt. Refer to «Poly V-belt, removing and installing»(ref-276269-S17467268642008010300000) .
| Component | Nm |
|---|---|
| Bracket for ancillary units to engine | 25 |
| Bracket for After-run coolant pump -V51- to cylinder block | 20 |