Remove
- 1. Open bonnet
- 2. Disconnect battery • Detach ground cable • 1 fastening nut
- 3. Detach relay holder (1) and preheating control unit (2) • Unclip from bracket • Lay aside relay holder and preheating control unit
- 4. Detach shift cables (3) • Unclip from ball heads • Release retainer (1) in direction of arrow and remove from bracket (2)
Note. Mark order of shift cables
- 5. Loosen top of starter (1) • Remove closure plug • Upper fastening bolt (3)
Important. Make sure that the fastening bolt does not fall into the clutch housing
- 6. Lift vehicle
- 7. Detach wiring harness • From starter • 2 fastening nuts
- 8. Remove starter • Lower fastening bolt (2)
Install
- 9. Install starter • Lower fastening bolt – Tightening torque 25 Nm
- 10. Attach wiring harness • To starter • 2 fastening nuts
- 11. Lower vehicle
- 12. Fasten top of starter • Upper fastening bolt – Tightening torque 25 Nm • Install closure plug
Important. Make sure that the fastening bolt does not fall into the clutch housing
- 13. Attach shift cables • Mount in bracket – Engage retainer • Clip onto ball heads
Note. Make sure shift cables are fitted in correct order
- 14. Install preheating control unit and relay holder • Clip into bracket
- 15. Connect battery • Connect ground cable. – Tightening torque 5,5 Nm
- 16. Program volatile memories
- 17. Close bonnet.