Tools Required
- J 5239 Connecting Rod Bolt Guide Set. See «Special Tools and Equipment»(ref-189348-S03958070272005090900000) .
- J 36660-A Electronic Torque Angle Meter. See «Special Tools and Equipment»(ref-189348-S03958070272005090900000) .
Scheme 198
Scheme 199
Scheme 200
- Remove the oil pan. Refer to «OIL PAN REPLACEMENT»(ref-189348-S16261219592005090900000) .
- Remove the spark plugs from the cylinders that are being serviced. Refer to «SPARK PLUGS»(ref-159248-S28146450102003112000000) in Removal & Installation.
- Position the connecting rod to be serviced to Bottom Dead Center (BDC) by rotating the crankshaft.
- Remove the oil pump bolt.
- Remove the oil pump and the oil pump driveshaft.
- Remove the crankshaft oil deflector nuts.
- Remove the crankshaft oil deflector.
- Remove the connecting rod cap nuts.
- Remove the connecting rod cap and the lower connecting rod bearing. IMPORTANT: Keep the bearings with the original connecting rod and cap. Do this in order to reassemble the connecting rod.
- Remove the lower connecting rod bearing from the connecting rod cap.
- Install the J 5239 to the connecting rod.
- Use the J 5239 to push up the connecting rod and the piston to access the upper connecting rod bearing.
- Remove the upper connecting rod bearing.
- Wipe the oil from the bearings.
- Inspect the connecting rod bearings. Refer to «PISTON, CONNECTING ROD, AND BEARINGS CLEANING AND INSPECTION»(ref-189348-S13911424162005090900000) .
- Measure the bearing clearance. Refer to «ENGINE MECHANICAL SPECIFICATIONS»(ref-189348-S35181383852005090900000) .