Installation
Check that there is no pressure in the hoses for the draining/recycling station. Evacuate the hoses if necessary.
Disconnect the low and high pressure hoses if necessary.
Connect the hose supplied with the injector kit to the station.
Scheme 427
Connect the injector to the hose.
Connect the drainage and filling valve to the injector using the hose.