Turbocharger Installation
- Install a new turbocharger oil return pipe gasket.
- Install the turbocharger oil return pipe into the engine block.
- Attach the positive crankcase ventilation (PCV) hose and fitting with O-ring from the camshaft cover to the turbocharger.
- Install the PCV hose fitting bolt and tighten to 10 N·m (89 lb in).
- Lubricate the O-ring on the turbocharger oil return pipe with clean engine oil.
- Install the turbocharger oil return pipe bolts and tighten to 10 N·m (89 lb in).
- Install a new turbocharger gasket.
- Install the turbocharger.
- Install the turbocharger nuts.
- Install the turbocharger brace.
- Install the turbocharger brace nut and tighten to 50 N·m (37 lb ft).
- Install the catalytic converter bracket.
- Install the catalytic converter bracket bolt and nut and tighten to 50 N·m (37 lb ft).
- Install the turbocharger coolant feed pipe.
- Install the turbocharger coolant feed pipe gaskets.
- Install the turbocharger coolant feed pipe bolts.
- Connect the positive crankcase ventilation (PCV) and hose assembly.
- Install the turbocharger air cooler outlet pipe.
- Install the turbocharger air cooler outlet pipe bolts and tighten to 25 N·m (18 lb ft).
- Install the turbocharger coolant return pipe.
- Install the turbocharger coolant return pipe gaskets.
- Install the turbocharger coolant return pipe bolts and tighten to 20 N·m (15 lb ft).