Objective:
Evaluation of the state of charge of the battery, voltage supply to the starter during starting and operation of the starter.
Measurement:
Plot of the battery voltage during the start procedure.
Preparation:
Switch off the engine, switch off the ignition, switch off all electrical loads.
Connections:
| INPUT A | COM/TRIGGER | INPUT B |
|---|---|---|
| Connect the red measurement lead to the positive pole of the battery. Connect the black measurement lead to the negative pole of the battery. |
Procedure Tech 31:
- 1. Download Reference curve.
- 2. Start engine.
Reference Curve:
Procedure Tech 32:
- 1. Download Setup file (the Tech 32 uses only Setup files, no reference curves).
- 2. Start engine.