Cylinder head/gasket, replacement
Special tools
9995452
9995454
9995670
9995451
9512050
9512767
9995450
9995718
9995719
Note. Since the illustrations in this service information are used for different model years and / or models, some variation may occur. However, the essential information in the illustrations is always correct.
Note. There are a number of versions of the VVT-unit (variable valve timing). Therefore it is extremely important to always read the information referring to the engine variant/model year to be remedied.
Preparations for removal of the drive shafts
Remove on the left and right-hand sides
- the tie rod from the wheel spindle
- the link rod from the anti-roll bar
- the screw that holds the brake pipe bracket to the bodywork
- the nut holding the control arm to the ball joint
- the center screw from the end of the drive shaft.
Oil sump replacement
Special tools
9512767
Scheme 594
Remove
- the oil dipstick and its pipe.
- the splashguard under the engine.
Drain the engine oil and remove the oil filter.
Release the oil cooler from the sump. Hang up at the rear.
Remove the screw from the bracket for the fuel line.
See Oil sump replacement
Remove components
| CAUTION | Remove the ignition key. |
Remove
- the cross stay between the suspension turrets
- the upper timing belt cover
- the servo reservoir and the expansion tank. Lift up and place on top of the engine. WARNING: Ensure that no power steering fluid is spilled. Extremely flammable.
- the auxiliaries belt
- the front timing belt cover.