Contents Section: Air Conditioning All sections

Time Allowance Opel Tigra A

Time Allowance

Op. No.

Operations
Time Allow.

D 9085 00

Electrical Check of Air Conditioning

TC: 99

(With Multimeter MKM-587-A and Electronic-Kit I KM-609)

Add:

Trouble-shooting for test step:

.2

05Radiator fan motor M4
.1
06Auxiliary fan motor M11
.1
07Voltage supply of compressor magnetic clutch Y1
.2
08Actuation of motors, radiator fan and auxiliary fan M4 and M11
.4
09Passage of series resistors, AC fan motor M10 with feed lines, speeds 1, 2, 3 and 4, voltage supply of AC fan motor M10
.2
10Voltage supply of pressure switch ASSY. S20 Passage when at rest, pressure switch ASSY. S20
.2
.3 Tigra
11Voltage supply of AC relay K6
.1
12Voltage supply of AC switch S101 and lead to wiring harness plug X6
.1
13Voltage supply of AC fan motor relay, 4th speed, K7
.1
14Voltage supply of radiator fan relay K51
.2
15Voltage supply of compressor relay K60
.2
16Voltage supply of radiator fan relay K67
.2
17Voltage supply of radiator fan relay K52
.2
18Voltage supply of radiator fan relay and AC fan, 1st speed, K26
.2
19Voltage supply of coolant temperature switch S128 Passage of coolant temperature switch S128
.2
20Voltage supply of engine speed increase pressure switch S109

Passage check of engine speed increase pressure switch S109

.1
.2 Tigra
21Voltage supply of coolant temperature switch S29

Passage of coolant temperature switch S29

.1
22Voltage supply of AC fan motor switch S24 and function of switch positions 1-4
.1
50Voltage supply of power steering pressure switch S61 (only C 14 NZ)

Passage when at rest of power steering pressure switch S61

.1
51Voltage supply of coolant solenoid valve Y14 (only Corsa-B, Japan)
*)
52Voltage supply of end switch, mixed air control knob S101.2

Passage in switched condition of end switch, mixed air control knob S101.2 (only Corsa-B, Japan)

*)
23R + R front panelling

(necessary for carrying out certain test steps)

.3
24R + R glove compartment

(necessary for carrying out certain test steps)

.2
25R + R inner panelling of one lower A pillar

(necessary for carrying out certain test steps)

.1
26R + R air conditioning controls

(necessary for carrying out certain test steps)

.2
*) Time allowances were not available at the time of publication and will be published at a later date as a Technical Information Bulletin.