Home/Honda/Insight/Honda Insight ZE2 (2009-2011)/Repair manual/Testing & Diagnostics/Fuel System and Emissions System: Maintenance
Contents Wiring diagrams Section: Testing & Diagnostics All sections

Fuel System and Emissions System: Maintenance Honda Insight ZE2

Testing & Diagnostics 1 illustration ~139 words

PCM Reset

  1. Reset the PCM with the HDS while the engine is stopped.
  2. Turn the ignition switch to LOCK (0).
  3. Turn the ignition switch to ON (II), and wait 30 seconds.
  4. Turn the ignition switch to LOCK (0), and disconnect the HDS from the DLC.
  5. Do the PCM idle learn procedure (see «PCM IDLE LEARN PROCEDURE»(ref-360285-S23715037572010042800000) ).

Scheme 92

Scheme 92: Clear/Learn Procedure (with the HDS)
  1. Connect the HDS to the data link connector (DLC) (A) located under the driver's side of the dashboard.
  2. Turn the ignition switch to ON (II).
  3. Make sure the HDS communicates with the PCM and all other vehicle systems. If it doesn't, go to the DLC circuit troubleshooting (see «DLC CIRCUIT TROUBLESHOOTING»(ref-360284-S14481644492010042800000) ).
  4. Select CRANK PATTERN in the ADJUSTMENT MENU with the HDS.
  5. Select CRANK PATTERN LEARNING with the HDS, and follow the screen prompts.