Home/BMW/M3/BMW M3 E90 (2007-2013)/Repair manual/Mechanical/Engine and Gearbox Suspension - Special Tools - e90
Contents Wiring diagrams Section: Mechanical All sections

Engine and Gearbox Suspension - Special Tools - e90 BMW M3 E90

Mechanical 2 illustrations ~306 words

Minimum set: Mechanical tools Device MW

Note. For removing and installing rubber mount on transfer box: ATC300, ATC350, ATC450

SI number

01 04 05 (175)

Consisting of

1 = 0495263 Bridge

2 = 0495264 Holder

3 = 0495265 Washer

Scheme 400

Scheme 400: SI number

Note. (Thrust washer)

4 = 0495266 Washer

Note. (Profile washer)

5 = 0495267 Washer

Note. (Washer with cylindrical pins)

6 = 0496792 Washer

Note. For installing rubber mount in transfer box housing.

In conjunction with: 22 1 044, 33 4 465/466

Tool Minimum set: Mechanical tools MW

Note. (Tool set) For removing and installing the transfer box rubber mount 22 1 018 for E46/16, E67 and RR

Storage Location

B41

C34

C35

C47

Scheme 401

Scheme 401: Storage Location

01 15 99 (483)

Consisting of

3 = 0493698 Synchronizing key

Note. For pulling out the transfer box rubber mount - Replaced by 22 1 018 (0 493 807)

3 = 0493699 Washer

Note. (Support disc) For installing the transfer box rubber mount - series: E53 - Replaced by 22 1 019 (0 493 808)

3 = 0493700 Synchronizing key

Note. For installing the transfer box rubber mount - series: E53

4 = 0493701 Synchronizing key

Note. For installing the transfer box rubber mount - series: E46/16, E83

6 = 0493702 Bridge

Note. For pulling out the transfer box rubber mount. Series: E46/16, E83

5 = 0493746 Washer

Note. Series: E46/16

7 = 0493806 Nut

Note. For installing and removing the transfer box rubber mount - series: E46/16

8 = 0493807 Bush

Note. For pulling out the transfer box rubber mount - series: E53, E83, E90

9 = 0493808 Washer

Note. For installing the transfer box rubber mount - series: E53

10 = 0494780 Washer

Note. For installing the rubber mount in the transfer box- transfer box: ATC400 Model series: E83