Installation
Installation is the reverse of removal.
Canister installation bolt/nut
19.6 ~ 29.4 N.m (2.0 ~ 3.0 kgf.m, 14.5 ~ 21.7 lb-ft)
Installation is the reverse of removal.
Installation is the reverse of removal.
Canister installation bolt/nut
19.6 ~ 29.4 N.m (2.0 ~ 3.0 kgf.m, 14.5 ~ 21.7 lb-ft)
Installation is the reverse of removal.