REMOVAL
Mountaineer
- Remove the grille fasteners and the grille.
- Remove the bumper cover. For additional information, refer to «BUMPERS»(ref-270925) .
- Remove the inner grille air deflector.
- Push the lower air deflector down past the transmission fluid cooler.
- Disconnect the transmission fluid cooler hoses. Remove and discard the transmission fluid cooler hoses and the clamps.
- Remove the upper transmission fluid cooler bolt.
- Remove the lower transmission fluid cooler bolts and the transmission fluid cooler.
INSTALLATION
All vehicles
- Install the transmission fluid cooler and the lower transmission fluid cooler bolts. Tighten to 7 Nm (62 lb-in).
- Install the upper transmission fluid cooler bolt. Tighten to 7 Nm (62 lb-in).
- Using new hoses and clamps, install the new transmission fluid cooler hoses.
- Push the lower air deflector back into place.
- Install the inner grille air deflector.
- Install the grille and the fasteners.
- Install the bumper cover. For additional information, refer to «BUMPERS»(ref-270925) .
- Fill the transmission fluid to the correct level using clean transmission fluid and inspect the leaks. For additional information, refer to «AUTOMATIC TRANSAXLE/TRANSMISSION - 5R55S»(ref-270891) for 5R55S or «AUTOMATIC TRANSAXLE/TRANSMISSION - 6R60»(ref-270910) for 6R60.
- With the vehicle in NEUTRAL, position it on a hoist. For additional information, refer to «JACKING AND LIFTING»(ref-270881) .
- Using a backup wrench to hold the case fitting securely, disconnect the transmission fluid cooler tubes.
- Remove the secondary latch from the cooler tube.
- Using the special tool, disconnect the quick connect coupler and remove the transmission fluid cooler tube from the radiator.
- Remove the secondary latch from the transmission fluid cooler tube.
- Using the special tool, disconnect the quick connect coupler and separate the transmission fluid cooler tube from the transmission fluid cooler hose.
- Remove the transmission fluid cooler tube bracket nut.
- Remove the fluid cooler tube bracket from the stud.
- Remove the transmission cooler tubes from the vehicle.
- Install the transmission cooler tubes into the vehicle.
- Install the transmission fluid cooler tube bracket onto the stud.
- Verify the case fitting torque. Tighten to 56 N.m (41 lb-ft).
- Using a backup wrench to hold the case fittings securely, install the transmission fluid cooler tubes. Tighten to 40 N.m (30 lb-ft).
- Install the transmission fluid cooler tube bracket nut. Tighten to 25 N.m (18 lb-ft).
- Connect the transmission fluid cooler tube to the transmission fluid cooler hose.
- Install the secondary latch.
- Connect the transmission fluid cooler tube to the radiator.
- Install the secondary latch.
- Fill transmission fluid to the correct level using clean transmission fluid and inspect for leaks. For additional information, refer to «AUTOMATIC TRANSAXLE/TRANSMISSION - 5R55S»(ref-270891) .
- With the vehicle in NEUTRAL, position it on a hoist. For additional information, refer to «JACKING AND LIFTING»(ref-270881) .
- Remove the secondary latch from the transmission fluid cooler tube.
- Using the special tool, disconnect the quick connect coupler and remove the transmission fluid cooler tube from the radiator.
- Remove the secondary latch from the transmission fluid cooler tube.
- Using the special tool, disconnect the quick connect coupler and separate the transmission fluid cooler tube from the transmission fluid cooler hose.
- Remove the transmission fluid cooler tube bracket nut.
- If equipped, index-mark the front driveshaft to maintain driveshaft balance.
- If equipped, remove the 4 U-joint strap bolts and remove the U-joint straps. Discard the bolts.
- Disconnect the engine oil low level sensor electrical connector and harness clips.
- Remove the bolt and disconnect the transmission fluid cooler tubes from the transmission.
- Remove and discard the 4 O-rings from the transmission fluid cooler tube ends.
- Remove the transmission fluid cooler tubes from the vehicle.
- Position the transmission fluid cooler tubes in the vehicle.
- Install 4 new O-rings on the transmission fluid cooler tube ends.
- Position the transmission fluid cooler tubes into the transmission, then install the bolt for the transmission cooler tube retainer. Tighten to 25 Nm (18 lb-ft).
- Install the transmission fluid cooler tube bracket and install the transmission fluid cooler tube bracket nut. Tighten to 12 Nm (9 lb-ft).
- If removed, install the U-joint straps and 4 new U-joint strap bolts. Tighten to 19 Nm (14 lb-ft).
- Connect the engine oil low level sensor electrical connector and harness clips.
- Connect the transmission fluid cooler tube to the radiator.
- Install the secondary latch to the transmission fluid cooler tube at the radiator.
- Connect the transmission fluid cooler tube to the transmission fluid cooler hose.
- Install the secondary latch to the transmission fluid cooler tube at the cooler hose.
- Fill the transmission fluid to the correct level, using clean transmission fluid, and inspect for leaks. For additional information, refer to «AUTOMATIC TRANSAXLE/TRANSMISSION - 6R60»(ref-270910) .
All vehicles
- With the vehicle in NEUTRAL, position it on a hoist. For additional information, refer to «JACKING AND LIFTING»(ref-270881) .
- Remove the grille fasteners and the grille.
- Remove the bumper cover. For additional information, refer to «BUMPERS»(ref-270925) .
- Remove the inner grille air deflector.
- Push the lower air deflector down past the transmission fluid cooler.
- Disconnect the transmission fluid cooler hoses. Remove and discard the transmission fluid cooler hoses and the clamps.
- Remove the secondary latch from the transmission fluid cooler tube.
- Using the special tool, disconnect the quick connect coupler and separate the transmission fluid cooler tube from the transmission cooler hose.
- Remove the secondary latch from the transmission fluid cooler hose.
- Using the special tool, disconnect the quick connect coupler and remove the transmission fluid cooler hose from the radiator.
- Remove the hoses from the retainer.
All vehicles
- Install the hoses into the retainer.
- Install the transmission fluid cooler hose to the radiator.
- Install the secondary latch.
- Install the transmission fluid cooler hose to the transmission fluid cooler tube.
- Install the secondary latch.
- Using new hoses and clamps, install the new transmission fluid cooler hoses.
- Push the lower air deflector back into place.
- Install the inner grille air deflector.
- Install the grille and the fasteners.
- Install the bumper cover. For additional information, refer to «BUMPERS»(ref-270925) .
- Fill the transmission fluid to the correct level using clean transmission fluid and inspect for leaks. For additional information, refer to «AUTOMATIC TRANSAXLE/TRANSMISSION - 5R55S»(ref-270891) for 5R55S or «AUTOMATIC TRANSAXLE/TRANSMISSION - 6R60»(ref-270910) for 6R60.