Contents Wiring diagrams Section: Mechanical All sections

Operation: Diagnosis Dodge Neon II

Mechanical 1 illustration ~108 words

INSPECTION

Inspect cover rails for flatness.

Scheme 59

Scheme 59: INSTALLATION
  1. Inspect gasket and seals. (Scheme 59) Replace as necessary. For replacement of spark plug tube seals, (Refer to «SPARK PLUG TUBE»(ref-177391-S26998280192005060100000) ). CAUTION: Do not attempt to loosen or remove baffle plate attaching screws. The screws are self-tapping, and in the attempt to retighten, thread damage (stripping) will result.
  2. Install cylinder head cover and gasket. Tighten bolts to 12 N.m (105 in. lbs.).
  3. Install ignition coil and spark plug cables see scheme 63 Tighten ignition coil fasteners to 12 N.m (105 in. lbs.).
  4. Connect make-up air and PCV hoses. ( see scheme 61 and see scheme 62 ).