Contents Wiring diagrams Section: Engine and Engine Aggregates All sections

Injector, Common Rail Diesel, Z19DT(H) Opel Vectra C

Objective:

Checking the electrical and mechanical functions of the common rail injector.

Measurement:

Plot of the voltage of the injector control signal.

Preparation:

Engine oil temperature greater than 80°C . Switch off all electrical loads. Switch off the engine and ignition.

Connections:

INPUT ACOM/TRIGGERINPUT B
Connect red measurement lead to pin 1 of the connection plug of the injectors. Connect the black ground lead to pin 2 of the connection plug of the injector.

Procedure Tech 31:

  1. 1. Download Reference curve.
  2. 2. Start the engine and allow it to idle.

Reference Curve:

Procedure Tech 32:

  1. 1. Download Setup file (the Tech 32 uses only Setup files, no reference curves).
  2. 2. Start the engine and allow it to idle.

Setup File:

Reference Curve: