Suspension Links Removal/Installation
- Tighten any part of the suspension that uses rubber bushings only after the vehicle has been lowered to the ground and unloaded. NOTE: Unloaded: Fuel tank is full. Engine coolant and engine oil are at specified levels. Spare tire, jack and tools are in designated position.
Power Steering Components Removal/Installation
- If any power steering fluid line has been disconnected anytime during the procedure, add ATF M-III, M-V, or equivalent (e.g. Dexron®III), bleed the fluid line, and inspect for leakage after the procedure has been completed.