Contents Wiring diagrams Section: 3.0l 6-cyl 5v Engine Controls - Fuel Injection & Ignition, Engine Code(s): Avk, Bgn All sections

Checking oxygen sensor learned values and oxygen sensor control Audi A4 B6

Checking oxygen sensor learned values and oxygen sensor control

Display on VAS5051

1 - Enter display group

  1. Enter "032" for "display group number 032" in zone -2- and confirm entry by pressing -Q- button.
  2. Check values in display zones -1- to -4-.
Display zones
1234
Display group 032: Oxygen sensor learned values before catalytic converter
DisplayXx.x%Xx.x%Xx.x%Xx.x%
DisplayOxygen sensor learned value Bank 1 at idle (additive)Oxygen sensor learned value, Bank 1, at part load (multiplicative)Oxygen sensor learned value Bank 2 at idle (additive)Oxygen sensor learned value Bank 2 at part load (multiplicative)
Specif. value4.0 to 4.0%10.0 to 10.0%4.0 to 4.0%10.0 to 10.0%
NoteIf the specification is not obtained. Refer to Evaluating display group 032
  1. Press <-- button.

Display on VAS5051

1 - Enter display group

  1. Enter "033" for "display group number 033" in zone -2- and confirm entry by pressing -Q- button.

Display on VAS5051

  1. Activate basic setting by pressing -A- button.
  2. Check indication in display fields -1- to -4-.
1234
Display group 033: Oxygen sensor control before catalytic converter
DisplayXx.x%X.xxx VXx.x%X.xxx V
DisplayOxygen sensor control Bank 1, sensor 1Oxygen sensor voltage Bank 1, sensor 1Oxygen sensor control Bank 1, sensor 2Oxygen sensor voltage Bank 1, sensor 2
Specif. valueIn range -10.0 to 10.0% value must fluctuate at least 2%1.400 to 1.600 VIn range -10.0 to 10.0% value must fluctuate at least 2%1.400 to 1.600 V
NoteIf specified value is not obtained Continuation. Refer to Checking oxygen sensor learned values and oxygen sensor controlIf specified value is not achieved Evaluation display group 033: Refer to Evaluating display group 033If specified value is not obtained Continuation. Refer to Checking oxygen sensor learned values and oxygen sensor controlIf specified value is not achieved Evaluation display group 033: Refer to Evaluating display group 033

Note on display zones 2 and 4

Displayed is the oxygen sensor voltage signal which was prepared and smoothed in the engine control module. 1.5 V in the display corresponds to oxygen sensor 1 (with the engine at operating temperature without secondary air system influence).

  1. Exit function "04 - Basic setting" by pressing <-- button.

(cont.)

If specification is not obtained in display zone 1 or display zone 3, or if the value does not fluctuate by at least 2%

  1. Perform drive test to free oxygen sensors from any possible residues and repeat test.

If the specified result is not achieved in display zones 1 or 3, or if the value does not fluctuate by at least 2%, even after the test drive

  1. Check basic voltage. Refer to «Checking basic voltage»(/audi/a4/b6-2000-2006/remont/cooling-fan/#30l-6-cyl-5v-engine-controls-fuel-injection-ignition-engine-codes-avk-bgn__checking-basic-voltage) .
  2. Check oxygen sensor heating before catalytic converter. Refer to «Oxygen sensors before catalytic converter, checking heating»(/audi/a4/b6-2000-2006/remont/cooling-fan/#30l-6-cyl-5v-engine-controls-fuel-injection-ignition-engine-codes-avk-bgn) .
  3. Check oxygen sensor before catalytic converter for aging. Refer to «Oxygen sensors before catalytic converter, checking aging»(/audi/a4/b6-2000-2006/remont/cooling-fan/#30l-6-cyl-5v-engine-controls-fuel-injection-ignition-engine-codes-avk-bgn__oxygen-sensors-before-catalytic-converter-checking) .
Display zone: 1/3 or 2/4Possible causes of malfunctionCorrective action
Oxygen sensor learned Values below specified rangeOil dilutionPerform oil change or drive vehicle fairly fast on out-of-town roads
High oil consumption
Mass air flow (MAF) sensor faultyTest mass air flow (MAF) sensor. Refer to Mass Air Flow (MAF) sensor -G70-, checking .
Evaporative emission (EVAP) canister purge regulator valve stuck openCheck Evaporative Emission (EVAP) canister purge regulator valve. Refer to Evaporative Emission (EVAP) canister purge regulator valve -N80-, checking .
Fuel pressure too highCheck fuel system pressure. Refer to Fuel pressure regulator and holding pressure (vehicles up to 06.03), checking
Injector not closingCheck injectors. Refer to Fuel injectors, checking
Oxygen sensor heating faulty Oxygen sensor faultyCheck oxygen sensor heating. Refer to Oxygen sensors before catalytic converter, checking heating .

Evaluating display group 032

Display zone: 1/3 or 2/4Possible causes of malfunctionCorrective action
Oxygen sensor learned values above specified rangeUnmetered air in intake areaCheck intake system for leaks and correct unmetered air. Refer to Intake air system for leaks (unmetered air), checking
Fuel pressure too lowCheck fuel system pressure. Refer to Fuel pressure regulator and holding pressure (vehicles up to 06.03), checking
Mass air flow (MAF) sensor faultyTest mass air flow (MAF) sensor. Refer to Mass Air Flow (MAF) sensor -G70-, checking
Oxygen sensor heating faulty Oxygen sensor faultyCheck oxygen sensor heating. Refer to Oxygen sensors before catalytic converter, checking heating
Injector only opens partially or not at allCheck injectors. Refer to Fuel injectors, checking
Evaporative emission (EVAP) canister purge regulator valve stickingCheck EVAP canister purge regulator valve. Refer to Evaporative Emission (EVAP) canister purge regulator valve -N80-, checking

Evaluating display group 032

Display zone: 2/4Possible causes of malfunctionCorrective action
Greater than 4.800 VShort to positive in wiring between oxygen sensor and control module Oxygen sensor faultyCheck wiring of oxygen sensors before catalytic converter. Refer to Oxygen sensors and oxygen sensor control before catalytic converter, checking
Less than 0.130 VShort to Ground in wiring between oxygen sensor and control module Oxygen sensor faultyReplace oxygen sensor before catalytic converter

Evaluating display group 033