Contents Section: Engine Cooling System All sections

INSPECTION Subaru Impreza WRX GD/GG рестайлинг

Engine Cooling System 11 illustrations ~212 words

INSPECTION

Replace the thermostat if the valve does not close completely at an ambient temperature or if the following test shows unsatisfactory results.

Immerse the thermostat and a thermometer in water. Raise water temperature gradually, and measure the temperature and valve lift when the valve begins to open and when the valve is fully opened. During the test, agitate the water for even temperature distribution. The measurement should be to the specification.

  1. Starts to open: 76-80°C (169-176°F)
  2. Fully opens: 91°C (196°F)

Scheme 88

Scheme 88

Scheme 89

Scheme 89: NON-TURBO MODEL

Scheme 90

Scheme 90

Scheme 91

Scheme 91

Scheme 92

Scheme 92

Scheme 93

Scheme 93

Scheme 94

Scheme 94

Scheme 95

Scheme 95

Scheme 96

Scheme 96

Scheme 97

Scheme 97

Scheme 98

Scheme 98
  1. Disconnect the battery ground cable.
  2. Lift-up the vehicle.
  3. Drain engine coolant completely. See «DRAINING OF ENGINE COOLANT»(/subaru/impreza-wrx/gdgg-2002-2005/remont/cooling-fan/#engine-cooling-system) , Replacement, Engine Coolant.
  4. Disconnect the connectors of radiator main fan (A) and sub fan (B) motor.
  5. Disconnect the radiator outlet hose (A) from thermostat cover.
  6. Disconnect the ATF cooler hoses (B) from the radiator. (AT vehicles only)
  7. Lower the vehicle.
  8. Disconnect the over flow hose.
  9. Remove the reservoir tank.
  10. Disconnect the radiator inlet hose from the engine.
  11. Remove the radiator upper brackets.
  12. Detach the power steering hose from the clip on the radiator.
  13. While slightly lifting radiator, slide it to left.
  14. Lift the radiator up and away from the vehicle.