APPEARANCE AND NOISE

  1. Check the propeller shaft tube surface for dents or cracks. If damaged, replace propeller shaft assembly.
  2. If center bearing is noisy or damaged, replace propeller shaft assembly.

VIBRATION

If vibration is present at high speed, inspect propeller shaft runout first.

Scheme 38

Scheme 38: VIBRATION

Scheme 39

Scheme 39
  1. With a dial indicator, measure propeller shaft runout at runout measuring points by rotating final drive companion flange with hands. Propeller shaft runout: Refer to " «PROPELLER SHAFT RUNOUT»(ref-516413-S30142081752012120600000) ". Propeller shaft runout measuring point (Point " ") Dimension A: 542 mm (21.34 in) B: 516.5 mm (20.33 in)
  2. If runout still exceeds specifications, separate propeller shaft at final drive companion flange or transfer companion flange; then change the phase between companion flange and propeller shaft by the one bolt hole at a time and install propeller shaft.
  3. Check runout again. If runout still exceeds specifications, replace propeller shaft assembly.
  4. Check the vibration by driving vehicle.