POWERTRAIN CONTROL MODULE (PCM) INSPECTION
| CAUTION | The PCM terminal voltages vary with change in measuring conditions and vehicle conditions. Always carry out a total inspection of the input systems, output systems, and PCM to determine the cause of trouble. Otherwise, a wrong diagnosis will be made. |
Scheme 624
Scheme 624: USING SST (104 PIN BREAKOUT BOX)
- Disconnect the negative battery cable.
- Disconnect the PCM connector.
- Connect the SST (104 Pin Breakout Box) to the PCM as shown in illustration.
- Tighten the connector bolt. Tightening torque 7.9 - 10.7 N.m (80 - 110 kgf.m, 69.5 - 95.4 ln.lbf)
- Connect the negative battery cable.
- Measure the voltage at each terminal.
- If any incorrect voltage is detected, check related systems, wiring harnesses and connectors.