Home/Jaguar/XKR/Jaguar XKR I (1998-2004)/Repair manual/Mechanical/Removal (Supercharged): Overview
Contents Wiring diagrams Section: Mechanical All sections

Removal (Supercharged): Overview Jaguar XKR I

  1. Open the engine compartment hood to service position and install body protection covers.
  2. Drain the cooling system. See «COOLING SYSTEM»(ref-160932-S05714134782004030900000). Retain the coolant drain tray in position to catch any spillage when removing the thermostat cover.
  3. Loosen and reposition the lower hose clamp. Remove the lower hose from the thermostat cover. (Схема №197)
  4. Remove the 3 thermostat cover bolts and remove the thermostat cover from the outlet pipe. Remove the thermostat and the seal from the outlet pipe. Discard the seal. (Схема №198)