Contents Wiring diagrams Section: Mechanical All sections

Engine 6.0L Diesel: Removal & Installation Ford Econoline E150

Mechanical ~165 words

Installation

  1. Install the RH exhaust manifold and bolts. Tighten the bolts in the sequence shown.
  2. Install the RH bolts for the turbocharger adapter pipe.
  3. Install the engine cover. For additional information, refer to «INTERIOR TRIM AND ORNAMENTATION»(ref-210204) .
  4. Connect the battery ground cable. For additional information, refer to «BATTERY, MOUNTING AND CABLES»(ref-210181) .
  1. Thoroughly clean the crankshaft front seal mounting surface.
  2. Apply Threadlock 262® to the outer circumference of the leading edge of the crankshaft.
  3. Using the special tool, install the oil seal and wear sleeve assembly.
  4. Install the crankshaft damper. For additional information, refer to «CRANKSHAFT PULLEY»(ref-213720-S11145631682005123000000) .
  1. Lubricate the inner gear with lithium assembly grease and install onto the crankshaft. Lubricate the outer gear with lithium assembly grease and mesh with the inner gear rotor in the oil pump housing. Wipe off the excess assembly grease.
  2. Install the gerotor cover and bolts.
  3. Install the crankshaft front oil seal. For additional information, refer to «CRANKSHAFT FRONT SEAL»(ref-213720-S27124982132005123000000) .