Home/Chevrolet/Tracker/Chevrolet Tracker II (1998-2004)/Repair manual/Removal & Installation/Engine Controls - Removal, Overhaul & Installation: Overhaul
Contents Wiring diagrams Section: Removal & Installation All sections

Engine Controls - Removal, Overhaul & Installation: Overhaul Chevrolet Tracker II

Disassembly & Reassembly

Disassembly procedure is not available from manufacturer. Manufacturer recommends replacement as an assembly.

  1. To install, reverse removal procedure. To ensure correct timing of distributor, install with rotor positioned as it was when distributor was removed.
  2. If engine was cranked after distributor was removed, remove No. 1 spark plug. Place finger over cylinder No. 1 spark plug hole. Crank engine slowly until compression is felt. Align timing mark on pulley to "0" mark on engine timing indicator. Ensure rotor points to cylinder No. 1 spark plug tower on distributor cap. Complete distributor installation. Start engine and check ignition timing.