Hose Setup, Checking Audi A8 D3 рестайлинг

Hose Setup, Checking

  1. Disconnect vacuum line at intake manifold.

Scheme 833

Scheme 833
  1. Connect hand vacuum pump VAG1390 to disconnected vacuum line.
  2. Operate hand vacuum pump at least 50 times (Vacuum build-up must be noticeable when operating).
  3. Disconnect hose from hand vacuum pump.

During this, vacuum must be released only between hand vacuum pump and check-valve.

  1. If further vacuum is audibly released, check-valve is leaky (replace check-valve).