Home/Audi/A6/Audi A6 C5 (1997-2001)/Repair manual/Air Conditioning/Version "2" (with block and bolt connection), removing
Contents Wiring diagrams Section: Air Conditioning All sections

Version "2" (with block and bolt connection), removing Audi A6 C5

Air Conditioning 3 illustrations ~117 words

Version "2" (with block and bolt connection), removing

  1. Remove hexagon nuts -A- (tightening torque: 8 Nm).
  2. Remove bolts -B- (tightening torque: 25 Nm).
  3. Remove refrigerant line -C- (tightening torque: 40 Nm).
  4. Remove refrigerant line -D-.

Scheme 120

Scheme 120

Note. Replace both O-ring seals -E- and -F- (17.2 mm x 1.8 mm and 16.7 mm x 1.8 mm). Seal all open connections.

Scheme 121

Scheme 121
  1. Remove hexagon nuts -A-. (Scheme 135)
  2. Loosen clamp -B
  3. Remove bracket -C
  4. Remove hexagon nuts -D- (tightening torque: 8 Nm).

Note. Only install accumulator with insulation -E-. (Scheme 135) Install spring -F- so it is positioned against marking on refrigerant hose and engaged on bracket

Scheme 122

Scheme 122