Home/Audi/A3/Audi A3 8P facelift (2004-2008)/Repair manual/Fuel System/2.0L - Multiport Fuel Injection - Engine Code(s): Bpy: Diag…
Contents Wiring diagrams Section: Fuel System All sections

2.0L - Multiport Fuel Injection - Engine Code(s): Bpy: Diagnosis Audi A3 8P facelift

Fuel System ~565 words

ON BOARD DIAGNOSTICS

  1. The engine control module is equipped with On Board Diagnostics (OBD). Before repairs such as fault finding, check the DTC memory first. Also the vacuum hoses and connections must be checked (unmetered air).
  2. Fuel hoses in engine compartment must only be secured with spring-type clips. The use of clamp or screw type clips is not permissible.
  3. For the electric components to work properly, a voltage of at least 11.5 Volts is required.
  4. Do not use sealants containing silicone. Particles of silicone drawn into the engine, will not be burnt in the engine and damage the oxygen sensor.
  5. The vehicles have a crash fuel shut-off. It reduces the risk of fire in an accident because the fuel pump relay switches the fuel pump off.
  6. This Set up also makes it easier to start the engine. When the driver-side door is opened, the Fuel Pump (FP) is activated for 2 seconds so that pressure builds in the fuel system, observe safety measures. Refer to «SAFETY PRECAUTIONS»(ref-496075-S12275717412012082100000) .

WIRING AND COMPONENTS, CHECKING WITH TEST BOX VAG 1598/42

Special Tools And Workshop Equipment Required

  1. Adapter - V.A.G 1598/39-1
  2. Adapter - V.A.G 1598/39-2
  3. Test Box 105 Pin - V.A.G 1598/42

Note. The test box is designed with 105 pins. The connection cable can be separated from the test box. This means that as new engine control module (ECM) connectors are introduced in the future, only a new cable must be designed and no longer the entire test box. The smaller of the two connectors on the ECM is assigned with terminals 1 to 60. The larger of the two connectors is assigned with terminals 1 to 94. For testing at the 60-pin harness connection, the - V.A.G 1598/39-1- is connected to the test box with connector -A-. Components of the 60-pin harness connection refer to the appropriate SYSTEM WIRING DIAGRAMS information. For testing at the 94-pin harness connection, the - V.A.G 1598/39-2- is connected to the test box with connectors -A- and -B-. Components of the 94-pin harness connection refer to the appropriate SYSTEM WIRING DIAGRAMS information. The V.A.G 1598/42 is designed so that it can be connected simultaneously to the engine control module harness and the engine control module itself. This is advantageous because electronic engine control remains fully functional (for example measurement of signals with engine running) when the test box is attached. Always use connector test Set V.A.G 1594 C to connect measuring equipment (for example voltage tester V.A.G 1527 B, portable multimeter V.A.G 1526 C, etc.) The procedures will indicate whether the engine control module is to remain connected to the test box or not.

CAUTIONTo avoid damaging electronic components, switch to the corresponding measuring range and observe all test conditions before connecting the test leads.

The engine control module (ECM) must be removed to disconnect the ECM multi-pin connectors. Refer to ENGINE CONTROL MODULE .

Connect V.A.G 1598/42 to wiring harness connector. Ground (GND) clip at test box must be clipped to battery minus. The procedures will indicate whether the engine control module is to be connected to the test box.

Perform test as described in relevant repair sequences.

Installing engine control module

Install in reverse order of removal.

Thereafter, the engine control module must be equipped with the metal retainer.

Clean threaded holes for shear bolts of locking compound residue. Cleaning can be performed with a thread cutter (tap).

Always use new shear bolts.

Check the DTC memory and, if necessary, erase.