Contents Wiring diagrams Section: Testing & Diagnostics All sections

Intake Air System: Removal & Installation Acura RL II facelift

Testing & Diagnostics 1 illustration ~132 words

Throttle Body Removal/Installation

CAUTIONDo not insert your fingers into the installed throttle body when you turn the ignition switch to ON (II) or while the ignition switch is ON (II). If you do, you will seriously injure your fingers if the throttle valve is activated.

Note. If you are replacing the throttle body, begin at step 1 . If you are removing the throttle body temporarily, begin at step 4 .

Scheme 223

Scheme 223
  1. Connect the HDS while the engine is stopped.
  2. Select the INSPECTION MENU with the HDS.
  3. Do the TP POSITION CHECK in the ETCS TEST.
  4. Turn the ignition switch to ON (II).
  5. Disconnect the MAP sensor connector (A).
  6. Remove the intake air duct (B).
  7. Disconnect the throttle body connector (C).
  8. Disconnect and plug the water bypass hoses (D).
  9. Remove the throttle body (E).
  10. Install the parts in the reverse order of removal with a new gasket (F), then do this: Refill the radiator with engine coolant (see «COOLANT CHECK»(ref-348514-S36082173852009112400000) ). Do «PCM IDLE LEARN PROCEDURE»(ref-348529-S13364648212009112400000) .