REMOVAL

  1. Remove engine cover. Refer to «INTAKE MANIFOLD COLLECTOR»(ref-233993-S36113184132006052800000) .
  2. Remove ignition coil. Refer to «IGNITION COIL»(ref-233993-S03131100382006052800000) .
  3. Remove spark plug using spark plug wrench (commercial service tool). CAUTION: Do not drop or shock it.

Scheme 14

Scheme 14

INSTALLATION

Install in the reverse order of removal.

  1. 24.5 N-m (2.5 kg-m, 18 ft-lb)
  1. Remove inner and outer balance weights from the road wheel. CAUTION: Be careful not to scratch the road wheel during removal.
  2. Using releasing agent, remove double-faced adhesive tape from the road wheel. CAUTION: Be careful not to scratch the road wheel during removal. After removing double-faced adhesive tape, wipe clean traces of releasing agent from the road wheel.