Scheme 1
- When installing rubber parts, final tightening must be carried out under unladen condition * with tires on ground. Oil will shorten the life of rubber bushings. Be sure to wipe off any spilled oil. *: Fuel, radiator coolant and engine oil full. Spare tire, jack, hand tools and mats in designated positions.
- After installing removed suspension parts, check wheel alignment and adjust if necessary.
- Use flare nut wrench when removing or installing brake tubes.
- Always torque brake lines when installing.
- Lock nuts are unreusable parts; always use new ones. When replacing, do not wipe the oil off the new lock nut before tightening.
DESCRIPTION
Note. Before checking the front wheel alignment, be sure to make a preliminary inspection (Unladen *). *: Fuel, radiator coolant and engine oil full. Spare tire, jack, hand tools and mats in designated positions.