INSTALLATION
Installation is in the reverse order of removal.
| CAUTION | When installing, install the positive battery terminal first. |
Battery clamp bolt : 14.7 N.m (1.5 kg-m, 11 ft-lb)
Battery terminal nut : 3.5 N.m (0.36 kg-m, 31 in-lb)
Reset electronic systems as necessary. Refer to " ADDITIONAL SERVICE WHEN REMOVING BATTERY NEGATIVE TERMINAL : SPECIAL REPAIR REQUIREMENT ".