Material
| Item | Specification |
|---|---|
| Threadlock and Sealer TA-25 | WSK-M2G351-A5 |
MATERIAL CHART
Scheme 2
- Remove the 4 transaxle roll restrictor brace bolts. To install, clean the bolts using a wire brush, apply new threadlock to the threads and tighten to 55 Nm (41 lb-ft).
- Remove the bolt and the transaxle roll restrictor brace. To install, clean the bolts using a wire brush, apply new threadlock to the threads and tighten to 48 Nm (35 lb-ft).
- Disconnect the exhaust gas recirculation (EGR) system module vacuum tube and electrical connector.
- Disconnect the EGR system module-to-EGR system module tube fitting. To install, tighten to 40 Nm (30 lb-ft).
- Remove the 2 bolts and the EGR system module. To install, tighten to 25 Nm (18 lb-ft).
- To install, reverse the removal procedure.
| Item | Specification |
|---|---|
| Threadlock and Sealer TA-25 | WSK-M2G351-A5 |
MATERIAL CHART
| Item | Specification |
|---|---|
| Threadlock and Sealer TA-25 | WSK-M2G351-A5 |
MATERIAL CHART
Scheme 3
Scheme 4
- Remove the 4 transaxle roll restrictor brace bolts. To install, clean the bolts using a wire brush, apply new threadlock to the threads and tighten to 55 Nm (41 lb-ft).
- Remove the bolt and the transaxle roll restrictor brace. To install, clean the bolts using a wire brush, apply new threadlock to the threads and tighten to 48 Nm (35 lb-ft).
- Disconnect the positive crankcase ventilation (PCV) valve tube from the PCV valve.
- If equipped, disconnect the PCV valve electrical connector.
- Rotate the PCV valve counterclockwise to remove from the valve cover.
- To install, reverse the removal procedure.