Scheme 1 Log in Scheme 1: BATTERY REMOVAL/INSTALLATION [L3, AJ] Remove in the order indicated in the table. Install in the reverse order of removal. See also:• ON-BOARD DIAGNOSTIC TEST [L3]• ON-BOARD DIAGNOSTIC TEST [AJ]