Removal and Installation
All Vehicles
Pinpoint Test C
C3
Vehicles with 2.0L Zetec engines
- Vehicles with 2.0L Zetec engines
C4
Vehicles with 3.0L (4V) engines
- Vehicles with 3.0L (4V) engines
C5
All vehicles
- All vehicles
C7
Vehicles with 2.0L Zetec engines
- Vehicles with 2.0L Zetec engines
C8
Vehicles with 3.0L (4V) engines
- Vehicles with 3.0L (4V) engines
C10
All vehicles
- All vehicles
Scheme 9
- Drain the engine cooling system. For additional information, refer to «COOLING SYSTEM DRAINING, FILLING AND BLEEDING»(ref-204619-S09134506632005111200000) .
- Remove the Gades bottle.
- To install, reverse the removal procedure.