Power Distribution System: Removal & Installation Dodge Caravan IV

Body Electrical ~197 words

INSTALLATION

  1. Snap the left side of the Integrated Power Module (IPM) housing in its mounting bracket and connect the various electrical connectors. NOTE: Ensure that the Connector Positive Assurance (CPA) on the five-pin B+ connector is positively engaged to prevent generating a Diagnostic Trouble Code (DTC).
  2. Rotate the IPM clockwise until secured in mounting bracket. An audible click may be heard.
  3. Install the battery «(Refer to ELECTRICAL/BATTERY SYSTEM/BATTERY - INSTALLATION)»(ref-248889-S17951773902007022700000) .
  4. Install the battery thermal guard.
  5. Connect the negative and positive battery cables.
  6. Using a scan tool, check for any stored diagnostic trouble codes. Ensure that all vehicle options are operational.
  1. Position the mounting ring on the instrument panel and feed the wires through the ring. Index the cap and the mounting ring with the index tab at the 9 o'clock position to the key in the instrument panel. Install the ring.
  2. Connect the wires to the base. Orientate the base alignment rib at the 11 o'clock position to mate the groove in the mounting ring to the base.
  3. Push the base into the bezel until it locks in place.
  4. Check operation of outlet or element and install the outlet cap.