Home/Dodge/Avenger/Dodge Avenger II facelift (2011-2014)/Repair manual/Body Electrical/Circuit Testing Procedures - Non-Dtc-Based Diagnostics: Rem…
Contents Wiring diagrams Section: Body Electrical All sections

Circuit Testing Procedures - Non-Dtc-Based Diagnostics: Removal & Installation Dodge Avenger II facelift

Body Electrical ~108 words

INSTALLATION

  1. Select a wire from the terminal repair kit that best matches the color and gage of the wire being repaired.
  2. Cut the repair wire to the proper length and remove one-half (1/2) inch of insulation.
  3. Splice the repair wire to the wire harness (see wire splicing procedure). Refer to «STANDARD PROCEDURE»(ref-485590-S21082399432012071300000) .
  4. Insert the repaired wire into the connector.
  5. Install the connector locking wedge, if required, and reconnect the connector to its mating half/component.
  6. Re-tape the wire harness starting at 1-1/2 inches behind the connector and 2 inches past the repair.
  7. Connect battery and test all affected systems.