Contents Wiring diagrams Section: Engine All sections

Data: cylinder block (DV4TED) Citroen Nemo I

Engine ~158 words

Identification marking

Marking at "a"

  • Engraving of the crankshaft bearings diameter category
  • Bearing orientation (clutch to timing)

Marking in "b"

  • Constructor's reference
  • Legislation type
  • Identification marking
  • Serial number

Marking in "c"

  • Machining reference
  • Year of manufacture

Marking in "d"

  • Marking following revamp
  • DV4 engines all types: "+ 0,6"

Data

DV4 engines all typesnominal dimensionrepair size
height "H"209,9 mm ± 0,05 mm209,7 mm ± 0,05 mm
Ø A73,7 (+ 0,018, -0) mm74,3 (+ 0,018, -0) mm

Crankshaft main bearing cap casing

WarningAdhere to the tightening torques

Pre-tighten in the following order

  • The 10 new crankshaft bearing cap screws (1) to 1 m.daN (order from 1 to 10)
  • The 14 seam screws (2) to 0,6 m.daN (order from 1 to 14)
  • The 2 seam screws (3) to 0,8 m.daN (inside the flywheel bell housing)

Slacken the 10 bolts (1) by 180°

Tighten the 10 bolts (2) to 3 m.daN (order from 1 to 10)

Tighten in the following order

  • The 10 bolts (1) to 140° (order from 1 to 10)
  • The 14 bolts (2) to 0,8 daNm (order from 1 to 14)