Home/Chevrolet/Tracker/Chevrolet Tracker II (1998-2004)/Repair manual/Testing & Diagnostics/Engine Control System & Engine Component Tests: Wiring
Contents Wiring diagrams Section: Testing & Diagnostics All sections

Engine Control System & Engine Component Tests: Wiring Chevrolet Tracker II

Testing & Diagnostics 1 illustration

PCM Harness Resistance

Turn ignition switch to LOCK position. Disconnect PCM and related component connectors. Check for open or short circuits between PCM connector terminal and component connector terminal. See POWERTRAIN CONTROL MODULE CONNECTOR TERMINAL IDENTIFICATION. (Scheme 19) See WIRING DIAGRAMS article. If harness is open or shorted, repair as necessary.

Scheme 19

Scheme 19: POWERTRAIN CONTROL MODULE CONNECTOR TERMINAL IDENTIFICATION