Contents Wiring diagrams Section: 5 Spd. Manual Transmission - 01A All sections

Installing Audi A6 C5 facelift

Installing

Installation is carried out in the reverse order, when doing this note the following

Scheme 74

Scheme 74: Installing
  1. Check that dowel sleeves for cover -A- are fitted in transmission cover -B- (arrows).
  2. Lightly coat sealing surfaces with AMV 188 001 02 sealant.
  3. Bolt on driveshaft. See «INSTALLING»(ref-196267-S21900535102005100800000) .
  4. Top up transmission oil and check oil level in transmission. See «CHECKING FLUID LEVEL»(ref-173788-S02154253112005032200000) .