Contents Wiring diagrams Section: Timing Belt All sections

Installation (All Models) Suzuki X-90 I

Timing Belt ~175 words
  1. If the tensioner was removed, install tensioner plate on tensioner. Ensure tensioner plate lug engages hole on rear of tensioner. Install tensioner spring. Tighten tensioner bolt finger tight to allow movement of tensioner.
  2. On 1989-94 Sidekick with 8-valve engine, remove valve cover. Loosen all valve adjusting screws. On all models, ensure timing marks are still aligned. Install timing belt. If reusing old belt, ensure direction arrow mark on timing belt is pointed in direction of crankshaft rotation. Ensure drive side of belt is free of slack.
  3. Loosen tensioner bolt and stud nut to place tension on timing belt. Turn crankshaft 2 revolutions clockwise to remove all slack from belt. Tighten tensioner stud nut and then tensioner bolt. See «TORQUE SPECIFICATIONS»(ref-155627-S03113314992003061800000) .
  4. Ensure timing marks are aligned. Install timing belt cover and tighten bolts to specification. Reverse removal procedure to complete installation. If coolant was drained, fill and bleed air from system. Adjust drive belts to proper tension. Adjust valve lash on 1989-94 Sidekick with 8-valve engine. See «VALVE CLEARANCE SPECIFICATIONS»(ref-155627-S42756413372003061900000) under ADJUSTMENTS.