Contents Wiring diagrams Section: Starter All sections

Starters: Removal & Installation Suzuki Verona I

Starter ~101 words

Starter Installation

  1. Install the starter-to-engine block mounting bolt and the transaxle-to-starter mounting bolt. Tighten: Tighten the starter-to-engine block mounting bolt to 45 N.m (33 lb-ft). Tighten the transaxle-to-starter mounting bolt to 50 N.m (37 lb-ft).
  2. Position the starter electrical wire on the solenoid terminals and the ground wire.
  3. Install the starter solenoid nut. Tighten: Tighten the starter solenoid nut to 7 N.m (61 lb-in.).
  4. Connect the starter solenoid connector.
  5. Install the air inlet hose.
  6. Install the air inlet hose bolts. Tighten: Tighten the air inlet hose bolts to 6 N.m (53 lb-in.).
  7. Connect the negative battery cable.