Contents Section: Cooling System (Mechanical) All sections

2AZ-FE Cooling: Removal & Installation Scion tC I рестайлинг

INSTALLATION

  1. INSTALL FAN SHROUD ASSEMBLY Attach the 2 pawl fittings of the shroud. Install the fan assembly with the 2 bolts. Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
  2. INSTALL RADIATOR SUPPORT LOWER
  3. INSTALL RADIATOR ASSEMBLY Install the radiator assembly with the 2 radiator support uppers and 2 bolts. Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf) Connect the radiator reservoir hose. Connect the 2 clamps of the engine room main wire. Connect the 2 cooling fan motor connectors.
  4. CONNECT NO. 1 OIL COOLER OUTLET TUBE (for Automatic Transaxle)
  5. CONNECT NO. 1 OIL COOLER INLET TUBE (for Automatic Transaxle)
  6. CONNECT RADIATOR HOSE OUTLET
  7. CONNECT RADIATOR HOSE INLET
  8. ADD ENGINE COOLANT (See «ON-VEHICLE INSPECTION»(ref-296235-S08215383142008082200000) )
  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
  10. CHECK FOR ENGINE COOLANT LEAKAGE (See «ON-VEHICLE INSPECTION»(ref-296235-S22380392102008082200000) )
  11. PERFORM INITIALIZATION Perform initialization (See «INITIALIZATION»(ref-296226-S09190278172008082200000) ). NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
  12. INSTALL ENGINE UNDER COVER RH