Contents Wiring diagrams Section: Automatic Transaxle All sections

Oil Strainer Nissan Altima L31

Automatic Transaxle 19 illustrations ~413 words

Oil Strainer

Check wire netting of oil strainer for damage.

Scheme 795

Scheme 795: Shift Solenoid Valves A and B, Line Pressure Solenoid Valve, Torque Converter Clutch Solenoid Valve
  1. Measure resistance.
  2. For shift solenoid valve A, refer to «DIAGNOSTIC PROCEDURE (A)»(ref-206576-S35300947262005112500000) .
  3. For shift solenoid valve B, refer to «DIAGNOSTIC PROCEDURE (B)»(ref-206576-S29475441052005112500000) .
  4. For line pressure solenoid valve, refer to «DIAGNOSTIC PROCEDURE (Line Pressure)»(ref-206576-S33418175982005112500000) .
  5. For torque converter clutch solenoid valve, refer to «DIAGNOSTIC PROCEDURE (TCC)»(ref-206576-S40931531332005112500000) .
  6. For overrun clutch solenoid valve, refer to «DIAGNOSTIC PROCEDURE (Overrun Clutch)»(ref-206576-S11995234812005112500000) .

Scheme 796

Scheme 796: Oil Cooler Relief Valve Spring
  1. Check springs for damage or deformation.
  2. Measure free length and outer diameter. Inspection standard: Refer to «CONTROL VALVES»(ref-206576-S03726964442005112500000)

Scheme 797

Scheme 797: ASSEMBLY

Scheme 798

Scheme 798

Scheme 799

Scheme 799

Scheme 800

Scheme 800

Scheme 801

Scheme 801

Scheme 802

Scheme 802

Scheme 803

Scheme 803

Scheme 804

Scheme 804

Scheme 805

Scheme 805

Scheme 806

Scheme 806

Scheme 807

Scheme 807

Scheme 808

Scheme 808

Scheme 809

Scheme 809

Scheme 810

Scheme 810

Scheme 811

Scheme 811

Scheme 812

Scheme 812

Scheme 813

Scheme 813
  1. Install upper, inter and lower body. Place oil circuit of upper body face up. Install steel balls in their proper positions. Install upper separating gasket, upper inter separating gasket and upper separating plate in order shown in illustration. Install reamer bolts f from bottom of upper body. Using reamer bolts as guides, install separating plate and gaskets as a set. Install pilot filter. Place lower body as shown in illustration (side of inter body face up). Install steel balls in their proper positions. Install inter body on upper body using reamer bolts f as guides. Be careful not to dislocate or drop steel balls. Install check balls and oil cooler relief valve springs in their proper positions in lower body. Install lower separating gasket, lower inter separating gasket and lower separating plate in order shown in illustration. Install bolts e from bottom of lower body. Using bolts e as guides, install separating plate and gaskets as a set. Temporarily install support plates on lower body. Install lower body on inter body using reamer bolts f as guides and tighten reamer bolts f slightly.
  2. Install O-rings to solenoid valves and terminal body. Apply ATF to O-rings.
  3. Install and tighten bolts. Bolt length, number and location : Install and tighten bolts b to specified torque. : 7 - 9 N.m (0.7 - 0.9 kg-m, 61 - 78 in-lb) Install solenoid valve assembly and line pressure solenoid valve to lower body. Set oil strainer, then tighten bolts a, c, d and nuts f to specified torque. : 7 - 9 N.m (0.7 - 0.9 kg-m, 61 - 78 in-lb) Tighten bolts e to specified torque. : 3.4 - 4.4 N.m (0.35 - 0.45 kg-m, 30.4 - 39.1 in-lb)