Contents Section: Ignition Switch/steering Lock All sections

Power Systems: Removal & Installation Mazda MX-5 NB рестайлинг

Ignition Switch/steering Lock 17 illustrations ~281 words

ROOM FUSE INSTALLATION

Note. When the ROOM fuse is burnt or removed, the malfunction indicator lamp illuminates. If the ROOM fuse is replaced or installed with the ignition switch at the ON position, the malfunction indicator lamp will continue to illuminate.

Scheme 1

Scheme 1: ROOM FUSE INSTALLATION
  1. Turn the ignition switch to the LOCK position.
  2. Install the ROOM fuse.

Scheme 2

Scheme 2: IGNITION SWITCH REMOVAL/INSTALLATION
  1. Disconnect the negative battery cable.
  2. Remove the column cover. (See «COLUMN COVER REMOVAL/INSTALLATION»(/mazda/mx-5/nb-2001-2005/remont/exteriorinterior-trim/#interior-trim) .)
  3. Remove in the order indicated in the table.
  4. Install in the reverse order of removal.

Scheme 3

Scheme 3: IGNITION SWITCH INSPECTION

Scheme 4

Scheme 4
  1. Remove the column cover. (See «COLUMN COVER REMOVAL/INSTALLATION»(/mazda/mx-5/nb-2001-2005/remont/exteriorinterior-trim/#interior-trim) .)
  2. Disconnect the ignition switch connector.
  3. Inspect for continuity between the ignition switch terminals using an ohmmeter. If not as specified, replace the ignition switch.

Scheme 5

Scheme 5: KEY REMINDER SWITCH INSPECTION

Scheme 6

Scheme 6

Scheme 7

Scheme 7
  1. Remove the column cover. (See «COLUMN COVER REMOVAL/INSTALLATION»(/mazda/mx-5/nb-2001-2005/remont/exteriorinterior-trim/#interior-trim) .)
  2. Disconnect the key reminder switch connector.
  3. Inspect for continuity between the key reminder switch terminals using an ohmmeter. If not as specified, replace the steering lock. (See «STEERING WHEEL AND COLUMN REMOVAL/INSTALLATION».)

Scheme 8

Scheme 8: RELAY LOCATION

Scheme 9

Scheme 9: Relay type

Scheme 10

Scheme 10: Type A

Scheme 11

Scheme 11
  1. Remove the relay.
  2. Inspect for continuity between the relay terminals using an ohmmeter. If not as specified, replace the relay.

Scheme 12

Scheme 12: Type B

Scheme 13

Scheme 13
  1. Remove the relay.
  2. Inspect for continuity between the relay terminals using an ohmmeter. If not as specified, replace the relay.

Scheme 14

Scheme 14: Type C

Scheme 15

Scheme 15
  1. Remove the relay.
  2. Inspect for continuity between the relay terminals using an ohmmeter. If not as specified, replace the relay.

Scheme 16

Scheme 16: Five-terminal

Scheme 17

Scheme 17
  1. Remove the relay.
  2. Inspect for continuity between the relay terminals using an ohmmeter. If not as specified, replace the relay.