RAV4
- Remove the floor shift indicator trim bezel. (Scheme 270) Remove rear floor console box. (Scheme 271)
- Remove front floor console box assembly. Remove shift cable by squeezing together the retaining tabs. (Scheme 272) Remove floor shift assembly by removing the 4 bolts. (Scheme 273)
- Remove the shift knob retaining screws and O/D main switch. Remove the upper position indicator housing and slide cover. Remove the grooved pin, wiring connector and remove the shift interlock ECU.
- To assemble, install the shift interlock ECU, wiring connector and the grooved pin. Install the slide cover and upper position indicator housing.
- Install the floor shift assembly and tighten to specification. See «TORQUE SPECIFICATIONS»(ref-144214-S23617783902002091000000). Install O/D main switch and shift knob assembly.
- Install the front and rear floor console boxes. Install the floor shift indicator trim bezel.