INSTALLATION
- INSTALL STARTER ASSEMBLY Install the starter assembly with the 2 bolts. Torque: 37 N*m (380 kgf*cm, 28 ft.*lbf) Connect the wire harness to terminal 30 and install the nut. Then, attach the terminal cap. Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) Connect the terminal 50 connector to the starter assembly.
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- INSTALL NO. 2 AIR CLEANER INLET (See INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See INSTALLATION )
- PERFORM INITIALIZATION Perform initialization procedure (See INITIALIZATION ). NOTE: Some vehicle systems require initialization after reconnecting the cable to the negative battery terminal.
Scheme 133
- INSPECT STARTER RELAY ASSEMBLY Using an ohmmeter, measure the resistance between each terminal. Standard resistance RESISTANCE SPECIFICATION Tester Connection Specified Condition 3 - 5 10 kohms or higher Below 1 ohms (when battery voltage is applied to terminals 1 and 2) If the result is not as specified, replace the starter relay assembly.
Scheme 134
- INSPECT STARTER CUT RELAY Using an ohmmeter, measure the resistance between each terminal. Standard resistance RESISTANCE SPECIFICATION Tester Connection Specified Condition 3 - 5 10 kohms or higher Below 1 ohms (when battery voltage is applied to terminals 1 and 2) If the result is not as specified, replace the starter cut relay.