Contents Wiring diagrams Section: Charging System All sections

Charging: Removal & Installation Lexus ES XV40

Charging System ~391 words

INSTALLATION

  1. INSTALL GENERATOR ASSEMBLY Install the bracket with the bolt. Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) (Схема №54): Locating Bracket Bolt Install the wire harness clamp stay with the bolt. Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf) (Схема №55): Locating Wire Harness Clamp Stay Bolts Connect the wire harness clamp. Install the generator assembly to the cylinder block with the bolt. Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) (Схема №56): Locating Generator Assembly Bolt Install the 2 bolts. Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) (Схема №57): Locating Generator Bolts Connect the generator connector to the generator assembly. Install the generator wire with the nut. Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) Install the terminal cap. Connect the 2 wire harness clamps. Connect the magnetic clutch connector to the compressor and magnetic clutch. (Схема №58): Locating Generator Connector, Wire Harness Clamps And Wire Harness Nut
  2. INSTALL V-RIBBED BELT (See «INSTALLATION»(ref-283093-S36814178942008041700000) )
  3. INSTALL RADIATOR ASSEMBLY (See «INSTALLATION»(ref-283095-S34241682862008041700000) )
  4. INSTALL FAN SHROUD (See «INSTALLATION»(ref-283095-S34241682862008041700000) )
  5. INSTALL RADIATOR SUPPORT UPPER (See «INSTALLATION»(ref-283095-S34241682862008041700000) )
  6. CONNECT NO. 1 OIL COOLER OUTLET TUBE (See «INSTALLATION»(ref-283095-S34241682862008041700000) )
  7. CONNECT NO. 1 OIL COOLER INLET TUBE (See «INSTALLATION»(ref-283095-S34241682862008041700000) )
  8. CONNECT RADIATOR HOSE OUTLET (See «INSTALLATION»(ref-283095-S34241682862008041700000) )
  9. CONNECT RADIATOR HOSE INLET (See «INSTALLATION»(ref-283095-S34241682862008041700000) )
  10. CONNECT RADIATOR RESERVOIR TANK HOSE (See «INSTALLATION»(ref-283095-S34241682862008041700000) )
  11. INSTALL MILLIMETER WAVE RADAR SENSOR ASSEMBLY (w/Dynamic Radar Cruise Control System) (See «INSTALLATION»(ref-283119-S01020670112008041700000) )
  12. INSTALL FRONT BUMPER ENERGY ABSORBER (See «REASSEMBLY»(ref-283116-S12947305112008041700000) )
  13. INSTALL FRONT BUMPER ASSEMBLY (See «INSTALLATION»(ref-283116-S26519527622008041700000) )
  14. INSTALL NO. 1 AIR CLEANER INLET (See «INSTALLATION»(ref-283093-S25114169122008041700000) )
  15. INSTALL NO. 2 AIR CLEANER INLET (See «INSTALLATION»(ref-283093-S25114169122008041700000) )
  16. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See «INSTALLATION»(ref-283100-S06986286212008041700000) )
  17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See «INSTALLATION»(ref-283093-S25114169122008041700000) )
  18. ADD ENGINE COOLANT (See «ON-VEHICLE INSPECTION»(ref-283095-S36778739482008041700000) )
  19. CHECK FOR ENGINE COOLANT LEAKS (See «COOLING SYSTEM»(ref-283095-S35963749672008041700000) )
  20. INSTALL ENGINE UNDER COVER LH
  21. INSTALL ENGINE UNDER COVER RH
  22. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH
  23. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
  24. INSTALL FRONT FENDER APRON SEAL RH
  25. INSTALL V-BANK COVER SUB-ASSEMBLY (See «INSTALLATION»(ref-283093-S25114169122008041700000) )
  26. INSTALL ENGINE ROOM SIDE COVER LH (See «INSTALLATION»(ref-283093-S25114169122008041700000) )
  27. INSTALL ENGINE ROOM SIDE COVER RH (See «INSTALLATION»(ref-283093-S25114169122008041700000) )
  28. INSTALL COOL AIR INTAKE DUCT SEAL (See «INSTALLATION»(ref-283093-S25114169122008041700000) )
  29. INSTALL FRONT WHEEL RH (See «INSTALLATION»(ref-283093-S36814178942008041700000) )
  30. PERFORM INITIALIZATION Perform initialization procedure (See «INITIALIZATION»(ref-283083-S29543038892008041700000) ). NOTE: Some vehicle systems require initialization after reconnecting the cable to the negative battery terminal.