Contents Wiring diagrams Section: Engine Control Systems All sections

Engine Emission Control (4.2l) Land Rover Range Rover L322

Engine Control Systems 2 illustrations ~129 words

SPECIFICATIONS

DescriptionNm
Exhaust gas recirculation (EGR) modulator valve bolts10
Exhaust gas recirculation (EGR) feed pipe to EGR valve bolt21
Positive Crankcase Ventilation (PCV) valve bolts10

TORQUE SPECIFICATIONS

Scheme 55

Scheme 55: REMOVAL

Scheme 56

Scheme 56
  1. Disconnect the battery ground cable. Refer to «Specifications»(/land-rover/range-rover/l322-2005-2009/remont/charging-system/#charging-system-general-information) .
  2. Remove the engine cover. Refer to «Engine Cover - 4.2L, Vehicles With: Supercharger»(/land-rover/range-rover/l322-2005-2009/remont/exteriorinterior-trim/#interior-trim-and-ornamentation) .
  3. Release the wiring harness from the PCV valve.
  4. Remove the PCV valve. Disconnect the PCV hose. Remove the 2 bolts. Remove and discard the 2 O-ring seals.

INSTALLATION

  1. Install the PCV valve. Clean the components. Install the new O-ring seals. Lubricate the O-ring seals with clean engine oil. Tighten the bolts to 10 Nm (7 lb.ft).
  2. Attach the wiring harness.
  3. Install the engine cover. Refer to «Engine Cover - 4.2L, Vehicles With: Supercharger»(/land-rover/range-rover/l322-2005-2009/remont/exteriorinterior-trim/#interior-trim-and-ornamentation) .
  4. Connect the battery ground cable. Refer to «Specifications»(/land-rover/range-rover/l322-2005-2009/remont/charging-system/#charging-system-general-information) .