Scheme 1
Scheme 2
Scheme 3
- Disconnect the negative (-) battery terminal.
- Remove the head lamp mounting bolts (2EA), then disconnect the lamp connectors.
- Installation is the reverse of removal.
OPERATION CHECK
Check that the lights operate according to the following timing chart.