Fastener Tightening Specifications
| Application | Specification | |
|---|---|---|
| Metric | English | |
| P-Clamp Mounting Nut | 4 N.m | 35 lb in |
| P-Clamp Mounting Bolt | 10 N.m | 89 lb in |
| P-Clamp Self-Tapping Screw | 7 N.m | 62 lb in |
Fastener Tightening Specifications
Tools Required
J 39529 Heater Hose Pliers. See Special Tools and Equipment .
Removal Procedure
- Remove the bolt from coolant recovery reservoir.
- Set aside the coolant recovery reservoir.
- Partially drain the engine coolant. Refer to Draining and Filling Cooling System in Engine Cooling in the G/H Van Service Manual.
- Remove the high pressure regulator (HPR) inlet hose (1) clamp from the tee fitting (7) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Disconnect the HPR inlet hose (1) from the tee fitting (7).
- Remove the HPR coolant hose P-clamp bolts (3).
- Remove the HPR inlet hose (1) clamp using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Disconnect the HPR inlet hose (1) from the fitting.
- Drain any remaining coolant from the hose into a suitable container.
- Remove the underbody coolant hose P-clamp bolts (1-5) observing their location.
- Pull the coolant hose out from under the underbody heat shield (3).
Installation Procedure
- Route the coolant hose through the underbody heat shield (3).
- Connect the HPR inlet hose and clamp to the fitting (1) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Install the HPR hose P-clamps and mounting screws (3). Tighten: Tighten the self-tapping mounting screw to 7 N.m (62 lb in). Tighten the U-nut mounting screw to 10 N.m (89 lb in).
- Attach the P-clamps and hoses to the underbody at their previously observed location. Tighten: Tighten the P-clamp mounting screws to 4 N.m (35 lb in).
- Connect the HPR inlet hose and clamp (1) to the tee fitting (7) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Position the coolant recovery reservoir and install the mounting bolt. Tighten: Tighten the bolt to 11 N.m (97 lb in).
- Fill the cooling system. Refer to Draining and Filling Cooling System in Engine Cooling in the G/H Van Service Manual.
- Verify that the system has no leaks.
J 39529 Heater Hose Pliers. See Special Tools and Equipment .
- Remove the bolt from coolant recovery reservoir.
- Set aside the coolant recovery reservoir.
- Partially drain the engine coolant. Refer to Draining and Filling Cooling System in Engine Cooling in the G/H Van Service Manual.
- Remove the high pressure regulator (HPR) inlet hose (1) clamp from the tee fitting (7) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Disconnect the HPR inlet hose (1) from the tee fitting (7).
- Remove the HPR coolant hose P-clamp bolts (3).
- Remove the HPR inlet hose (1) clamp using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Disconnect the HPR inlet hose (1) from the fitting.
- Drain any remaining coolant from the hose into a suitable container.
- Remove the underbody coolant hose P-clamp bolts (1-4) observing their location.
- Remove the hose from the vehicle.
- Connect the HPR inlet hose and clamp to the fitting (1) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Install the HPR hose P-clamps and mounting screws (3). Tighten: Tighten the mounting bolt to 10 N.m (89 lb in). Tighten the mounting nut to 4 N.m (35 lb in).
- Attach the P-clamps and hoses to the underbody at their previously observed location. Tighten: Tighten the P-clamp mounting nuts to 4 N.m (35 lb in). Tighten the self-tapping mounting screw to 7 N.m (62 lb in).
- Connect the HPR inlet hose and clamp (1) to the tee fitting (7) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Position the coolant recovery reservoir and install the mounting bolt. Tighten: Tighten the bolt to 11 N.m (97 lb in).
- Fill the cooling system. Refer to Draining and Filling Cooling System in Engine Cooling in the G/H Van Service Manual.
- Verify that the system has no leaks.
J 39529 Heater Hose Pliers. See Special Tools and Equipment .
- Remove the bolt from coolant recovery reservoir.
- Set aside the coolant recovery reservoir.
- Partially drain the engine coolant. Refer to Draining and Filling Cooling System in Engine Cooling in the G/H Van Service Manual.
- Remove the high pressure regulator (HPR) outlet hose (2) clamp from the tee fitting (5) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Disconnect the HPR outlet hose (2) from the tee fitting (5).
- Remove the HPR coolant hose P-clamp bolts (3).
- Remove the HPR outlet hose (2) clamp using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Disconnect the HPR outlet hose (2) from the fitting.
- Drain any remaining coolant from the hose into a suitable container.
- Remove the underbody coolant hose P-clamp bolts (1-5) observing their location.
- Pull the coolant hose out from under the underbody heat shield (3).
- Route the coolant hose through the underbody heat shield (3).
- Connect the HPR outlet hose and clamp to the fitting (2) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Install the HPR hose P-clamps and mounting screws (3). Tighten: Tighten the self-tapping mounting screw to 7 N.m (62 lb in). Tighten the U-nut mounting screw to 10 N.m (89 lb in).
- Attach the P-clamps and hoses to the underbody at their previously observed location. Tighten: Tighten the P-clamp mounting screws to 4 N.m (35 lb in).
- Connect the HPR outlet hose and clamp (3) to the tee fitting (5) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Position the coolant recovery reservoir and install the mounting bolt. Tighten: Tighten the bolt to 11 N.m (97 lb in).
- Fill the cooling system. Refer to Draining and Filling Cooling System in Engine Cooling in the G/H Van Service Manual.
- Verify that the system has no leaks.
J 39529 Heater Hose Pliers. See Special Tools and Equipment .
- Remove the bolt from coolant recovery reservoir.
- Set aside the coolant recovery reservoir.
- Partially drain the engine coolant. Refer to Draining and Filling Cooling System in Engine Cooling in the G/H Van Service Manual.
- Remove the high pressure regulator (HPR) outlet hose (2) clamp from the tee fitting (5) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Disconnect the HPR outlet hose (2) from the tee fitting (5).
- Remove the HPR coolant hose P-clamp bolts (3).
- Remove the HPR outlet hose (2) clamp using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Disconnect the HPR outlet hose (2) from the fitting.
- Drain any remaining coolant from the hose into a suitable container.
- Remove the underbody coolant hose P-clamp bolts (1-4) observing their location.
- Remove the hose from the vehicle.
- Connect the HPR outlet hose and clamp to the fitting (2) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Install the HPR hose P-clamps and mounting screws (3). Tighten: Tighten the mounting bolt to 10 N.m (89 lb in). Tighten the mounting nut to 4 N.m (35 lb in).
- Attach the P-clamps and hoses to the underbody at their previously observed location. Tighten: Tighten the P-clamp mounting nuts to 4 N.m (35 lb in). Tighten the self-tapping mounting screw to 7 N.m (62 lb in).
- Connect the HPR outlet hose and clamp (2) to the tee fitting (5) using the J 39529 . See «Special Tools and Equipment»(/chevrolet/chevy-express-g3500/1996-2012/remont/cooling-system-mechanical/#engine-cooling-system-alternative-fuel) .
- Position the coolant recovery reservoir and install the mounting bolt. Tighten: Tighten the bolt to 11 N.m (97 lb in).
- Fill the cooling system. Refer to Draining and Filling Cooling System in Engine Cooling in the G/H Van Service Manual.
- Verify that the system has no leaks.
Special Tools
Special Tools Illustration Tool Number/Description J 39529 Heater Hose Pliers
See also:
• Fastener Notice
• Special Tools and Equipment